Use
of PM10 Monitoring Data to Evaluate the Effectiveness of the Dust Control
Program During the Construction of the Central Artery Tunnel Project
James Dolan,
Alex Kasprak, Guido Schattanek, Ping K. Wan, Bechtel/parsons Brinckerhoff,
Parsons Brinckerhoff, Inc., Bechtel Power Corporation Boston, MA
Presented
at the 91st Annual AWMA Meeting, June 14-18, 1998
Abstract
The Central Artery/Tunnel (CA/T) project in Boston has been under
construction for over six years. The downtown portion of the project consists
of the excavation and construction of an eight lane underground roadway
over which the existing elevated highway continues to carry almost 200,000
vehicles a day. Currently, more than 100 pieces of construction equipment
operate within a mile stretch of this 300-foot wide urban corridor where
residents, businesses, pedestrians, local street and elevated highway
traffic will continue to exist during the next few years of construction.