|
PM2.5 Sampling Procedures
For PM2.5
sampling the following changes must be made to the filter holder:
-
Ensure that the
multiple impactor adapter with the PM10 impactor (silver)
is installed on top of the preseparator assembly, while the PM2.5
impactor (gold) is installed in the preseparator assembly.
-
Clean and lubricate the EMT (Easy Maintenance Target) every 5 sampling periods. The EMT may need to be cleaned more or less frequently depending on the degree of soiling.
-
After the sampler has been assembled, calibrated, verified to be in proper working order, and a filter loaded in the filter holder assembly, set flow rate adjustment in accordance with procedures as shown in the Operation Manual.
- Follow all other procedures in the Operation Manual, noting that PM2.5 is being sampled rather than PM10 and TSP.
» Back
to Basic Operation Page
|